Chapter 03 · MONO Oxygen Bangtao Beach
MONO Oxygen construction, date by date
Five site records from 2 Nov 2023 to 1 Oct 2025: Phase 1 finished, Phase 2 from cleared land to two-storey frames.
Site records
What stood on site, date by date
The latest record is from 1 October 2025. The build stage and timing of the villa you choose come in writing with the offer.
Phase 2 · B1–B5
Two storeys in concrete frame
In the photos of 1 October 2025 the Phase 2 villas stood two storeys high in reinforced-concrete frame under scaffolding: the upper slabs were cast on the front villas, the first brick walls were going up and the pool shells were cast.
Phase 2 · B1–B5
Ground-floor frames across the plots
On 16 September 2025 the ground-floor concrete frames stood under steel scaffolding across the Phase 2 plots, beside the finished Phase 1 boundary wall.
Phase 2 · B1–B5
Foundations
On 31 May 2025 the footings were dug, with the starter bars and formwork in place.
Phase 1 · A1–A6
Phase 1 finished
In the photos of 1 October 2024 the Phase 1 villas were complete: the pools filled, the kitchens and living rooms finished. These are the villas we show.
Phase 2 · B1–B5
Phase 2 land cleared
On 2 November 2023 the Phase 2 land was cleared and levelled.
Phase 1, finished
The villa you can walk into
Phase 2 follows the finished Phase 1 villa: the same rooms, the same glass blocks and timber, a little more deck and terrace. We arrange a viewing of a finished villa.
Your request
Today's photos from the site
We send current photos of the Phase 2 site and the stage of the villa you choose before you decide.
Today's listMONO Oxygen Bangtao Beach
Free villas, prices, ownership and the contract draft
Your villaMONO Oxygen Bangtao Beach
A viewing, today's list or both
Name a villa, a phase or just the date you arrive. We reply with the free villas, their prices and times to visit.